Sign up to our mailing list
+44 (0) 1753 214 500 sales@sollatek.com
  • Products
    • Voltage Protection
    • Telecom & Substation Power Solutions
    • Electronic Refrigeration Controllers
    • Connectivity Solutions
    • Solar Products
    • Voltage Optimisation & LED Lighting
  • About us
    • About us
    • Corporate Social Responsibility (CSR)
    • Useful Links and Contacts
    • News & Events
    • Sollatek Blog
    • Sollatek Quality Policy
  • Case Studies
  • Support
    • Support Home
    • Downloads
    • Frequently Asked Questions
    • Glossary
    • Tech Support
  • Partners
  • Contact Us
+44 (0) 1753 214 500 sales@sollatek.com
  • Products
    • Voltage Protection
    • Telecom & Substation Power Solutions
    • Electronic Refrigeration Controllers
    • Connectivity Solutions
    • Solar Products
    • Voltage Optimisation & LED Lighting
  • About us
    • About us
    • Corporate Social Responsibility (CSR)
    • Useful Links and Contacts
    • News & Events
    • Sollatek Blog
    • Sollatek Quality Policy
  • Case Studies
  • Support
    • Support Home
    • Downloads
    • Frequently Asked Questions
    • Glossary
    • Tech Support
  • Partners
  • Contact Us

Home / Case Studies / AVR for MTN GSM in Ghana

Product Categories
  • Voltage Protection
  • Telecom & Substation Power Solutions
  • Electronic Refrigeration Controllers
  • Solar Products
  • Voltage Optimisation (iVolt)

AVR for MTN GSM in Ghana

AVR for MTN GSM in Ghana
PRODUCT: AVR, Freoguard
HISTORY:

Ghana mobile phone users enjoy upgraded reception from major GSM operator MTN powered by Sollatek.

Called in to address a specific power issue, Sollatek designers and engineers identify other ways to help their client. This multi-solution approach is made possible through a combination of leading technologies and an ethos of listening carefully to the client.

When MTN (Ghana’s major GSM operator) decided to enhance the quality and smooth running of its mobile phone network for its customers, the company came to Sollatek. MTN’s main aim was to protect its equipment from erratic electricity supply and achieve fulltime running with minimum use of costly backup diesel generators.

The Sollatek electronic AVR has no motor and no moving parts a feature putting the company ahead of the competition and translating into two benefits for MTN. Firstly, the absence in the AVR of a motor means savings in maintenance costs and time. Secondly, the Sollatek solid state technology is designed and manufactured to withstand extremes of high humidity, dry weather and dust. These features make the AVR highly reliable and ideal for the company’s operations in Ghana.

As work progressed, the three-day training session in Accra revealed further ways to fine-tune a system already being enhanced by Sollatek technology as MTN engineers discussed with Sollatek engineers:

  • A common loss of one phase due to overhead cables being broken or due to connection damage. This meant frequent use of back-up diesel generators – with all their disadvantages – while electrical companies took several weeks to repair the cables.
  • Malfunction of the air conditioning systems during change over between generator to grid power.

 

In the first case, the solution was a modification to the AVR (and training for the engineers) to power the equipment from two phases, thereby keeping the sites running on grid power as much as possible. Similarly, some sites are supplied with only one phase and neutral so a similar modification to the AVR was offered to run the site on single phase. To combat the air conditioner problems a Sollatek Freoguard30 was provided.

Sollatek’s high performance systems are rugged, highly reliable, affordable and the ideal solution for MTN and other companies operating in demanding environments such as Ghana. A bonus to MTN is the peace of mind of good local support readily available at the Sollatek office and workshop in the Ghanaian capital Accra.

MTN is now considering Sollatek’s solar power systems as a viable alternative for powering their sites in the northern part of the country where the electricity supply is especially poor and generators are used for weeks on end.

 




download PDF

ABOUT US

Find out more about Sollatek

TECH SUPPORT

Get assistance with your project

HOW CAN WE HELP?

Contact us for more information

CASE STUDIES

Get insights into our solutions

YOUR LOCAL PARTNER

Find us in your local area

FEEDBACK

Tell us what you think
Certificates
SIGN UP FOR THE LATEST
This field is for validation purposes and should be left unchanged.

FOLLOW US
  • © Sollatek 2023. All Rights Reserved.
  • Site Map
  • Privacy Policy

Product Wizard